
PARTIAL ROAD CLOSURES ALONG QED, PLEASE PLAN AHEAD
January 21, 2022
PLAN TO DEMOLISH 85-YEAR-OLD REWA BRIDGE
February 1, 2022Fiji Roads Authority (FRA) would like to advise members of the public that emergency repair works is currently being carried out along Ratu Mara Road.
Please note that the Suva bound lane is divided into two lanes; one for the Nausori bound traffic and the other for the Suva bound traffic.
We will open the Nausori bound to two lanes at 4pm during the afternoon peak hour. During this time, the Suva bound travelers will be directed to travel through Grantham Road, up through Raiwasa Road or Gaji Road. The traffic controllers will be stationed at the Grantham Road lights and Raiwasa Road junction to help direct traffic.
Works are expected to proceed late into the night, and travellers along this area are advised to expect delays and take this notice into account when finalising travel plans. For further queries please call the FRA on 5720.
Read Here: ROAD CLOSURE FOR EMERGENCY REPAIR WORKS ALONG RATU MARA ROAD





