
NASAU BRIDGE 1 NADI – EMERGENCY CLOSURE
March 26, 2026
2025-2026
March 31, 202631st March, 2026
The Fiji Roads Authority (FRA) wishes to advise members of the public that Asphalt Surfacing works will be carried out along the following roads:
- Stinson Parade
The Fiji Roads Authority will undertake Asphalt Concrete (AC) works along Stinson Parade from 31st March 2026, with works scheduled between 8:00pm and 5:00am.
To accommodate these paving works, traffic from the Central Street junction will be reduced to a single lane, with two-lane traffic resuming approximately 200 meters after the junction.
- Toorak Road
The Fiji Roads Authority will undertake Asphalt Concrete (AC) works along Toorak Road from 1 April 2026, with works scheduled between 8:00pm and 5:00am.
To accommodate these paving works, traffic along Toorak Road – from Renwick Road to the Suva Street junction – will be restricted to a single lane. Stop-and-go traffic management will be in place, with traffic controllers on site.
Motorists travelling along these route sew are encouraged to plan their travel and exercise caution when passing through the work zone.
FRA urges all road users to adhere to posted signage and follow the instructions of traffic controllers to ensure the safety of motorists, pedestrians, and work personnel.
Please note that all works are weather-dependent.
FRA appreciates the public’s patience and cooperation as these essential improvement works are carried out.
For questions or further details, please contact FRA at our toll-free number 5720 (available on weekdays from 8:00 AM to 5:00 PM) or email info@fijiroads.org





