
MILL AND FILL PAVEMENT RENEWALS WORK – RATU MARA ROAD
March 16, 2026
ASPHALT CONCRETE (AC) WORKS – STINSON PARADE AND TOORAK ROAD
March 31, 202626th March, 2026
The Fiji Roads Authority (FRA) advises the public that Nasau Bridge 1 along Nasau Road in Nadi will be temporarily closed from 9:00pm on Saturday, 28 March to 6:00am on Sunday, 29 March 2026 to facilitate urgent deck repair works due to accelerated deterioration.
Road closure advisory signs will be posted in advance of the closure period to direct motorists on detour routes.
An alternative route will be available; however, motorists are advised to plan their travel accordingly.
FRA urges all road users to adhere to posted signage and follow the instructions of traffic controllers to ensure the safety of motorists, pedestrians, and work personnel.
Please note that all works are weather-dependent.
FRA appreciates the public’s patience and cooperation as these essential improvement works are carried out.
For questions or further details, please contact FRA at our toll-free number 5720 (available on weekdays from 8:00 AM to 5:00 PM) or email info@fijiroads.org





