
FRA Empowering Rural Women Through Infrastructure Development
March 9, 2025
REPAIRS WORKS SCHEDULED FOR NABOUTOLU BRIDGE 2 – BA
March 18, 2025The Fiji Roads Authority (FRA) would like to inform the public that road resurfacing work is currently ongoing on Laucala Bay Road in front of the University of the South Pacific Campus and will continue until Sunday, 16th March, 2025.
The work is being conducted in two daily shifts: the day shift from 9:00 AM to 4:00 PM and the night shift from 8:00 PM to 4:00 AM. During this period, the affected section will be reduced to single-lane traffic.
An alternative route is available from Grantham Road, diverting traffic through Telau Street and Varani Street, before rejoining Laucala Bay Road and vice versa.
We kindly request that all motorists adhere strictly to the posted signage and follow the instructions of traffic controllers to ensure the safety of all road users and workers. Thank you for your cooperation.





