
12T RESTRICTION ON NAVALA CROSSING IN BA, MAINTENANCE TO BEGIN
December 12, 2019
STOP/ GO TRAFFIC ARRANGEMENT AT WAISEI BRIDGE ON KINGS ROAD
December 12, 2019Fiji Roads Authority (FRA) would like to advise members of the public that traffic will be managed under stop / go arrangement on Ba Bridge from 9am to 4pm on the 17th December to cater for routine maintenance works.
These works are required to improve the protection works on the expansion joints and also better the transition at both ends of the bridge deck.
Maintenance works include re-bolting down the plates and adjusting asphalt ramps to the plates.
FRA contractor will require a single lane closure, and when required, the bridge will be fully closed at controlled intervals of 15-30mins due to lack of lateral safety zones.
FRA is requesting motorists to strictly adhere to the signs placed and follow the directions of the traffic controllers to ensure the safety of other motorists and workmen alike.
Members of the public travelling along this area to take this notice into account when finalizing travel plans. FRA wishes to apologies for the short term inconvenience. For further queries please call FRA on 5720.
Read Here: STOP- GO TRAFFIC ARRANGEMENT AT BA BRIDGE ON 17TH DECEMBER





