
NAITONITONI ROAD CLOSURE FOR EMERGENCY CULVERT RESTORATION WORKS
November 18, 2024
EMERGENCY CLOSURE OF ELLINGTON JETTY, RAKIRAKI FROM 6 JANUARY – 6 APRIL 2025
January 9, 2025
19th November, 2024
The Fiji Roads Authority (FRA) will be carrying out Local Area Traffic Management (LATM) trials in Nadi Town area aimed at alleviating traffic congestion.
To facilitate these trials, FRA’s contractor will undertake demolition and reconstruction works on existing structures within Nadi Town area to facilitate the required re-designed traffic flow layout. As part of the trial, all the traffic signals within the Town area will also be temporary turned off.
Demolition and Reconstruction Period: 23rd November 2024 to 8th December 2024
New Layout Trial Period: 8th December, 2024 – 8th March, 2025 (3 months)
Re-Design Layout Changes:
- Queens Road (Main Street): Traffic to be reverted to a single lane two-way traffic flow.
- Andrews Road & Raniga Street: Both roads to become single lane two-way traffic flow.
- Naitavo Lane: The direction of traffic to be reversed to optimize traffic flow. Single lane one-way traffic flow.
- Sahu Khan Lane, Clay Street, and Market Lane: These roads will remain one-way. Single lane one-way traffic flow.
- Baker Lane and Vunavau Lane: The direction of travel on both lanes will be reversed to optimize traffic flow.
- Heavy Vehicles: Restricted from accessing Nadi Town’s main street but can access through Andrews street, Raniga Street and Ratu Naevo Road.
Motorists are advised to be aware of these changes and to follow all posted temporary signs while navigating through Nadi Town. Traffic Management Team will also be directing/assisting traffic during the three months to assist motorists.
Should you have any questions or require additional information, please do not hesitate to reach out to the FRA via our toll-free number 5720 (available on weekdays from 8 a.m. to 5 p.m.) or through email at info@fijiroads.org





