
STOP AND GO ARRANGEMENT ON WAIDAMU BRIDGE
August 26, 2022
STOP/ GO TRAFFIC ARRANGEMENT AT KORONUBU BRIDGE ON 27 – 29 SEPTEMBER 2022 – URGENT WORKS
September 21, 2022The public is advised that traffic will be managed under stop / go arrangement on the Navisa Bridge, Koronubu Road from 9 am to 2 pm on the 27 – 29 September 2022 to cater for urgent periodic maintenance works.
These works are required to improve the serviceability of the bridge. Maintenance works include the replacement of damaged runners, and decking timber.
Fiji Roads Authority (FRA) Contractor will require partial closures, at controlled intervals of 15-30 minutes due to the lack of lateral safety zones.
FRA is requesting motorists to strictly adhere to the signs placed and follow the directions of the traffic controllers to ensure the safety of other motorists and workmen alike.
Members of the public travelling along this area to take this notice into account when finalizing travel plans. For further queries please call FRA on 5720.
Read Here: STOP- GO TRAFFIC ARRANGEMENT AT KORONUBU BRIDGE ON 27 – 29 SEPTEMBER 2022





