{"id":8026,"date":"2020-08-06T03:01:39","date_gmt":"2020-08-06T03:01:39","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=6203"},"modified":"2020-08-06T03:01:39","modified_gmt":"2020-08-06T03:01:39","slug":"road-rehabilitation-works-completed-on-six-sections-in-central","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/","title":{"rendered":"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL"},"content":{"rendered":"<p>06 August 2020<\/p>\n<p>Fiji Roads Authority (FRA) has successfully completed road rehabilitation work on six sections in the Central Division.<\/p>\n<p>\u201cWe have completed sections on Princes Road, Ratu Sukuna, Fletcher Road, Nabua Commercial area, Karsanji Street and Nabua Bypass Road with road improvement works, including road surface improvements, improved drainage, badly damaged sections of the kerb and channel and line marking, says Chief Executive Officer Jonathan Moore.<\/p>\n<p>\u201cTo reduce traffic congestion impacts the majority of these works were carried out at night. Previously the repetitive pothole repairs have been used as an interim measure too many times and for too long. Being a temporary repair there is a limit to the number of times it can be done in the same location. Once that limit has been reached the road requires major rehabilitation to bring it back to a serviceable condition.\u201d<\/p>\n<p>He said these works will improve the driving conditions and reduce travel time that will greatly enhance the viability as these roads are among the most frequently travelled routes in the Central Division. <\/p>\n<p>\u201cThe FRA is taking steps to deliver rehabilitated sections of road throughout the country which will help provide a durable, long-life solution; minimizing future repair. Motorists are advised to please abide by the speed limit at all times.\u201d<\/p>\n<p>Mr Moore said that the rehabilitation of the next group of severely deteriorated roads will commence from this month in Suva, Nadi and Labasa. <\/p>\n<p><strong>Read Here: <a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/ROAD-REHABILITATION-WORKS-COMPLETED-ON-SIX-SECTIONS-IN-CENTRAL.pdf\">ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>06 August 2020 Fiji Roads Authority (FRA) has successfully completed road rehabilitation work on six sections in the Central Division. \u201cWe have completed sections on Princes<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":8560,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,2],"tags":[],"class_list":["post-8026","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"06 August 2020 Fiji Roads Authority (FRA) has successfully completed road rehabilitation work on six sections in the Central Division. \u201cWe have completed sections on Princes [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-06T03:01:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/Nabua-commercial-Road-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zafiya Shamim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zafiya Shamim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/\"},\"author\":{\"name\":\"Zafiya Shamim\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/5349174c7c2be38059bdf4f4dd745184\"},\"headline\":\"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL\",\"datePublished\":\"2020-08-06T03:01:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/\"},\"wordCount\":254,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Nabua-commercial-Road-1.jpg\",\"articleSection\":[\"Media Release\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/\",\"name\":\"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Nabua-commercial-Road-1.jpg\",\"datePublished\":\"2020-08-06T03:01:39+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/5349174c7c2be38059bdf4f4dd745184\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Nabua-commercial-Road-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Nabua-commercial-Road-1.jpg\",\"width\":1600,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2020\\\/08\\\/06\\\/road-rehabilitation-works-completed-on-six-sections-in-central\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/5349174c7c2be38059bdf4f4dd745184\",\"name\":\"Zafiya Shamim\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"caption\":\"Zafiya Shamim\"},\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/zafiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/","og_locale":"en_US","og_type":"article","og_title":"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL - Fiji Roads Authority","og_description":"06 August 2020 Fiji Roads Authority (FRA) has successfully completed road rehabilitation work on six sections in the Central Division. \u201cWe have completed sections on Princes [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/","og_site_name":"Fiji Roads Authority","article_published_time":"2020-08-06T03:01:39+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/Nabua-commercial-Road-1.jpg","type":"image\/jpeg"}],"author":"Zafiya Shamim","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Zafiya Shamim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/"},"author":{"name":"Zafiya Shamim","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/5349174c7c2be38059bdf4f4dd745184"},"headline":"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL","datePublished":"2020-08-06T03:01:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/"},"wordCount":254,"commentCount":0,"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/Nabua-commercial-Road-1.jpg","articleSection":["Media Release","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/","url":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/","name":"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/Nabua-commercial-Road-1.jpg","datePublished":"2020-08-06T03:01:39+00:00","author":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/5349174c7c2be38059bdf4f4dd745184"},"breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/Nabua-commercial-Road-1.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2020\/08\/Nabua-commercial-Road-1.jpg","width":1600,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2020\/08\/06\/road-rehabilitation-works-completed-on-six-sections-in-central\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"ROAD REHABILITATION WORKS COMPLETED ON SIX SECTIONS IN CENTRAL"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/5349174c7c2be38059bdf4f4dd745184","name":"Zafiya Shamim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","caption":"Zafiya Shamim"},"url":"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-08-22 15:32:13","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/8026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=8026"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/8026\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/8560"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=8026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=8026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=8026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}