{"id":5070,"date":"2019-06-05T02:42:31","date_gmt":"2019-06-05T02:42:31","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=5070"},"modified":"2019-06-05T02:42:31","modified_gmt":"2019-06-05T02:42:31","slug":"fra-begins-road-works-on-ratu-dovi-road","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/","title":{"rendered":"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD"},"content":{"rendered":"<p><strong>5 June 2019<\/strong><\/p>\n<p>Major roadwork\u2019s on Ratu Dovi Road has begun from yesterday, Tuesday, 4<sup>th<\/sup> June, 2019.<\/p>\n<p><strong>Works begin daily from 7.30pm to 5.30am from Laqere intersection up to the Reba Circle intersection, Ratu Dovi Road. During day time, works will begin after 9am and finish at 4pm.<\/strong><\/p>\n<p>Ratu Dovi Road has badly failed pavements which required extensive full-width repairs as a method of treatment.\u00a0 To reduce traffic congestion impacts the majority of these works will be carried out at night.<\/p>\n<p>During the carriageway repairs, we will be closing the worst affected sections of Ratu Dovi Road to single lane to carry out structural pavement repairs and resurfacing works.<\/p>\n<p>We will be removing the badly deformed surface which has deteriorated due to their age and the high volume of traffic. \u00a0These works are part of the Accelerated Sealed Repairs programme which will mitigate the current road conditions in these worst affected areas. This treatment is similar to that which was recently carried out along Princes Road over the past few weeks.<\/p>\n<p>The greater part of the pavement repair works will be carried out at night, restricting the road to single lane traffic under Stop\/Go Traffic Control.\u00a0 During the day the Contractor will maintain two-way traffic during peak morning and afternoon traffic periods.\u00a0 To reduce the risk of rain delays surfacing works will be carried out from time-to-time in off-peak traffic hours and motorists are to expect delays.<\/p>\n<p>Members of the public are requested to make their travel plans with these works in mind, avoiding this route if possible.\u00a0 Motorists are reminded to strictly adhere to the directions of the flagman and the site traffic control, to ensure the safety of other motorists and workmen alike.<\/p>\n<p>These works on Ratu Dovi Road are expected to be completed by Monday 17 June 2019, weather permitting. \u00a0\u00a0Other roads planned for similar Accelerated Sealed Repairs in June include Princes Road (Tamavua Village) and Queens Road (Suvavou).<\/p>\n<p>For more information, please email <a href=\"mailto:info@fijiroads.org\">info@fijiroads.org<\/a> or call our toll free number 5720.<\/p>\n<p><strong>Read Here: <a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/FRA-BEGINS-ROAD-WORKS-ON-RATU-DOVI-ROAD.pdf\">FRA BEGINS ROAD WORKS ON RATU DOVI ROAD<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>5 June 2019 Major roadwork\u2019s on Ratu Dovi Road has begun from yesterday, Tuesday, 4th June, 2019. Works begin daily from 7.30pm to 5.30am from Laqere<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":5072,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,2],"tags":[],"class_list":["post-5070","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>FRA BEGINS ROAD WORKS ON RATU DOVI ROAD - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"5 June 2019 Major roadwork\u2019s on Ratu Dovi Road has begun from yesterday, Tuesday, 4th June, 2019. Works begin daily from 7.30pm to 5.30am from Laqere [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-05T02:42:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/Road-works-on-Ratu-Dovi-Road-last-night.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zafiya Shamim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zafiya Shamim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/\"},\"author\":{\"name\":\"Zafiya Shamim\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/fc910b6ea2b33752904c1ef55648ae22\"},\"headline\":\"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD\",\"datePublished\":\"2019-06-05T02:42:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/\"},\"wordCount\":351,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/Road-works-on-Ratu-Dovi-Road-last-night.jpg\",\"articleSection\":[\"Media Release\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/\",\"name\":\"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/Road-works-on-Ratu-Dovi-Road-last-night.jpg\",\"datePublished\":\"2019-06-05T02:42:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/Road-works-on-Ratu-Dovi-Road-last-night.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/Road-works-on-Ratu-Dovi-Road-last-night.jpg\",\"width\":1280,\"height\":960},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2019\\\/06\\\/05\\\/fra-begins-road-works-on-ratu-dovi-road\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\",\"name\":\"Fiji Roads Authority\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"width\":600,\"height\":100,\"caption\":\"Fiji Roads Authority\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/fc910b6ea2b33752904c1ef55648ae22\",\"name\":\"Zafiya Shamim\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"caption\":\"Zafiya Shamim\"},\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/zafiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/","og_locale":"en_US","og_type":"article","og_title":"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD - Fiji Roads Authority","og_description":"5 June 2019 Major roadwork\u2019s on Ratu Dovi Road has begun from yesterday, Tuesday, 4th June, 2019. Works begin daily from 7.30pm to 5.30am from Laqere [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/","og_site_name":"Fiji Roads Authority","article_published_time":"2019-06-05T02:42:31+00:00","og_image":[{"width":1280,"height":960,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/Road-works-on-Ratu-Dovi-Road-last-night.jpg","type":"image\/jpeg"}],"author":"Zafiya Shamim","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Zafiya Shamim","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/"},"author":{"name":"Zafiya Shamim","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/fc910b6ea2b33752904c1ef55648ae22"},"headline":"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD","datePublished":"2019-06-05T02:42:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/"},"wordCount":351,"commentCount":0,"publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/Road-works-on-Ratu-Dovi-Road-last-night.jpg","articleSection":["Media Release","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/","url":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/","name":"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/Road-works-on-Ratu-Dovi-Road-last-night.jpg","datePublished":"2019-06-05T02:42:31+00:00","breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/Road-works-on-Ratu-Dovi-Road-last-night.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2019\/06\/Road-works-on-Ratu-Dovi-Road-last-night.jpg","width":1280,"height":960},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2019\/06\/05\/fra-begins-road-works-on-ratu-dovi-road\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"FRA BEGINS ROAD WORKS ON RATU DOVI ROAD"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.fijiroads.org\/#organization","name":"Fiji Roads Authority","url":"https:\/\/www.fijiroads.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","width":600,"height":100,"caption":"Fiji Roads Authority"},"image":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/fc910b6ea2b33752904c1ef55648ae22","name":"Zafiya Shamim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","caption":"Zafiya Shamim"},"url":"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-11-08 15:39:45","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/5070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=5070"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/5070\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/5072"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=5070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=5070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=5070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}