{"id":3690,"date":"2018-04-22T02:34:05","date_gmt":"2018-04-22T02:34:05","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=3690"},"modified":"2018-04-22T02:34:05","modified_gmt":"2018-04-22T02:34:05","slug":"roadworks-kimberly-street-completed","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/","title":{"rendered":"ROADWORKS ON KIMBERLY STREET COMPLETED"},"content":{"rendered":"<p>22 April 2018<\/p>\n<p>Roadworks on Kimberly Street in Suva is now complete and open to traffic.<\/p>\n<p>Fiji Roads Authority (FRA) General Manager Network Operations and Maintenance Aram Goes says Kimberly Street had badly failed pavements which required extensive full-width repairs as a method of treatment.<\/p>\n<p>\u201cThis was due to the accelerated deterioration experienced when McArthur Street was closed for upgrading in late 2017 and the detour traffic that was particularly high in bus numbers, overloaded the already aged and deteriorated Kimberly Street,\u201d Mr Goes said.<\/p>\n<p>He said the works on Kimberly was not originally planned for this financial year and was added to the annual road reconstruction program to address the unacceptable road conditions for a populated, high-use central city street.<\/p>\n<p>\u201cWorks included full pavement reconstruction, relocating the installation of the water main outside the road pavement, footpath upgrade with kerb and channeling to improve the road for traffic and pedestrians alike throughout this road.\u201d<\/p>\n<p>Mr Goes said Kimberly Street is now fully reconstructed with a new granular pavement strengthened with cement stabilization and surfaced with a membrane seal covered with 56mm of asphalt.<\/p>\n<p>\u201cThe FRA wishes to thank the road users for their patience and co-operation during these important works.\u201d<\/p>\n<p>Meanwhile, further inner city road improvements are also underway on Raojibhai Patel, Vishnu Deo, Marlow and Ellery Streets.<\/p>\n<p>Read Here: <a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2018\/04\/ROADWORKS-ON-KIMBERLY-STREET-COMPLETED-1.pdf\">ROADWORKS ON KIMBERLY STREET COMPLETED<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>22 April 2018 Roadworks on Kimberly Street in Suva is now complete and open to traffic. Fiji Roads Authority (FRA) General Manager Network Operations and Maintenance<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":6804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-3690","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ROADWORKS ON KIMBERLY STREET COMPLETED - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ROADWORKS ON KIMBERLY STREET COMPLETED - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"22 April 2018 Roadworks on Kimberly Street in Suva is now complete and open to traffic. Fiji Roads Authority (FRA) General Manager Network Operations and Maintenance [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-22T02:34:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"646\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zafiya Shamim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zafiya Shamim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/\"},\"author\":{\"name\":\"Zafiya Shamim\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/15836ce054eafd9cc5d9d84e984f8d8b\"},\"headline\":\"ROADWORKS ON KIMBERLY STREET COMPLETED\",\"datePublished\":\"2018-04-22T02:34:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/\"},\"wordCount\":228,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"articleSection\":[\"Media Release\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/\",\"name\":\"ROADWORKS ON KIMBERLY STREET COMPLETED - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"datePublished\":\"2018-04-22T02:34:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"width\":1080,\"height\":646},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2018\\\/04\\\/22\\\/roadworks-kimberly-street-completed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ROADWORKS ON KIMBERLY STREET COMPLETED\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\",\"name\":\"Fiji Roads Authority\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"width\":600,\"height\":100,\"caption\":\"Fiji Roads Authority\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/15836ce054eafd9cc5d9d84e984f8d8b\",\"name\":\"Zafiya Shamim\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"caption\":\"Zafiya Shamim\"},\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/zafiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ROADWORKS ON KIMBERLY STREET COMPLETED - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/","og_locale":"en_US","og_type":"article","og_title":"ROADWORKS ON KIMBERLY STREET COMPLETED - Fiji Roads Authority","og_description":"22 April 2018 Roadworks on Kimberly Street in Suva is now complete and open to traffic. Fiji Roads Authority (FRA) General Manager Network Operations and Maintenance [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/","og_site_name":"Fiji Roads Authority","article_published_time":"2018-04-22T02:34:05+00:00","og_image":[{"width":1080,"height":646,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","type":"image\/jpeg"}],"author":"Zafiya Shamim","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Zafiya Shamim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/"},"author":{"name":"Zafiya Shamim","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/15836ce054eafd9cc5d9d84e984f8d8b"},"headline":"ROADWORKS ON KIMBERLY STREET COMPLETED","datePublished":"2018-04-22T02:34:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/"},"wordCount":228,"commentCount":0,"publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","articleSection":["Media Release"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/","url":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/","name":"ROADWORKS ON KIMBERLY STREET COMPLETED - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","datePublished":"2018-04-22T02:34:05+00:00","breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","width":1080,"height":646},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2018\/04\/22\/roadworks-kimberly-street-completed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"ROADWORKS ON KIMBERLY STREET COMPLETED"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.fijiroads.org\/#organization","name":"Fiji Roads Authority","url":"https:\/\/www.fijiroads.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","width":600,"height":100,"caption":"Fiji Roads Authority"},"image":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/15836ce054eafd9cc5d9d84e984f8d8b","name":"Zafiya Shamim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","caption":"Zafiya Shamim"},"url":"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 17:27:57","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/3690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=3690"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/3690\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/6804"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=3690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=3690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=3690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}