{"id":3127,"date":"2017-12-22T02:48:01","date_gmt":"2017-12-22T02:48:01","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=3127"},"modified":"2017-12-22T02:48:01","modified_gmt":"2017-12-22T02:48:01","slug":"road-improvement-works-completed-wainiyatu-naitonitoni-navua","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/","title":{"rendered":"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA"},"content":{"rendered":"<p><strong>22 December 2017<\/strong><\/p>\n<p>The OTTA surfacing trial project by the Fiji Roads Authority (FRA) from Wainiyatu-Naitonitoni in Navua is completed and well received by the public.<\/p>\n<p>FRA General Manager Maintenance and Network Operations Aram Goes says the OTTA surfacing is a cost effective treatment for alternative surfacing of low volume unsealed roads requiring very little surface preparation, saving significant time and money.<\/p>\n<p>\u201cConventional sealing of unsealed roads requires significant a lot of effort to prepare the pavement to a standard suitable to receive a chip seal surface.\u00a0 Even in locations where the existing unsealed road has adequate bearing capacity, significant work is still required, to bring up the gravel pavement to a \u2018mosaic\u2019 surface, before it can be sealed over.\u201d<\/p>\n<p>He said this low cost alternative surfacing treatment works well to eliminate grading requirements and mitigate dust nuisance.\u00a0 Mr Goes said it is important to note that the surface finish at time of construction still looks like a gravel road and it takes several weeks or even months for the bitumen below to slowly rise and bind the top gravel layer, depending on the traffic volumes.<\/p>\n<p>\u201cThis finished road surface behaves like a seal but does not look like a seal.\u201d<\/p>\n<p>He said there is a high demand for treating dust nuisance of unsealed roads, particularly around schools, villages and small settlements in remote rural communities.\u00a0 If this trial is successful further application of this OTTA surfacing will be considered on a case-by-case basis.\u00a0 This trial site has been chosen for its high traffic loads to see how it will perform under stress.\u00a0 Other trial sites likely to target lower traffic volume areas.<\/p>\n<p>Assistant Minister for Infrastructure and Transport Hon Vijay Nath met with the FRA, school and community stakeholders to discuss the dust issue and other traffic safety concerns.<\/p>\n<p>\u201cOne of the major concerns that we have is driver behaviour. We have placed the speed humps because some motorists speed in the area which compromises safety especially for school children,\u201d Mr Nath said.<\/p>\n<p>He said motorists must be responsible and adhere to the speed limits placed.<\/p>\n<p>Mr Nath also added that the OTTA trial surfacing project will help mitigate dust at significant cost savings compared to conventional road sealing with chip.<\/p>\n<p>Mr Nath has commended the FRA and its contractor Fulton Hogan Hiways for a job well done.<\/p>\n<p><strong>Read Full Report: <a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/ROAD-IMPROVEMENT-WORKS-COMPLETED-FROM-WAINIYATU-NAITONITONI-IN-NAVUA-1.pdf\">ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>22 December 2017 The OTTA surfacing trial project by the Fiji Roads Authority (FRA) from Wainiyatu-Naitonitoni in Navua is completed and well received by the public.<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":8244,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-3127","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"22 December 2017 The OTTA surfacing trial project by the Fiji Roads Authority (FRA) from Wainiyatu-Naitonitoni in Navua is completed and well received by the public. [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2017-12-22T02:48:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1429\" \/>\n\t<meta property=\"og:image:height\" content=\"1128\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zafiya Shamim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zafiya Shamim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/\"},\"author\":{\"name\":\"Zafiya Shamim\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/f97a59d3188256f89bc4cb59eac9fcb6\"},\"headline\":\"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA\",\"datePublished\":\"2017-12-22T02:48:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/\"},\"wordCount\":406,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2017\\\/12\\\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg\",\"articleSection\":[\"Media Release\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/\",\"name\":\"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2017\\\/12\\\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg\",\"datePublished\":\"2017-12-22T02:48:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2017\\\/12\\\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2017\\\/12\\\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg\",\"width\":1429,\"height\":1128},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/12\\\/22\\\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\",\"name\":\"Fiji Roads Authority\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"width\":600,\"height\":100,\"caption\":\"Fiji Roads Authority\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/f97a59d3188256f89bc4cb59eac9fcb6\",\"name\":\"Zafiya Shamim\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"caption\":\"Zafiya Shamim\"},\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/zafiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/","og_locale":"en_US","og_type":"article","og_title":"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA - Fiji Roads Authority","og_description":"22 December 2017 The OTTA surfacing trial project by the Fiji Roads Authority (FRA) from Wainiyatu-Naitonitoni in Navua is completed and well received by the public. [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/","og_site_name":"Fiji Roads Authority","article_published_time":"2017-12-22T02:48:01+00:00","og_image":[{"width":1429,"height":1128,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg","type":"image\/jpeg"}],"author":"Zafiya Shamim","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Zafiya Shamim","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/"},"author":{"name":"Zafiya Shamim","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/f97a59d3188256f89bc4cb59eac9fcb6"},"headline":"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA","datePublished":"2017-12-22T02:48:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/"},"wordCount":406,"commentCount":0,"publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg","articleSection":["Media Release"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/","url":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/","name":"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg","datePublished":"2017-12-22T02:48:01+00:00","breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/12\/MOIT-Assistant-Minister-Hon-Vijay-Nath-with-FRA-GM-Network-Operations-and-Maintenance-Aram-Goes-and-Fulton-Hogan-Hiways-Country-Manager-Duncan-Fraser-in-Navua-1.jpg","width":1429,"height":1128},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/12\/22\/road-improvement-works-completed-wainiyatu-naitonitoni-navua\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"ROAD IMPROVEMENT WORKS COMPLETED FROM WAINIYATU-NAITONITONI IN NAVUA"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.fijiroads.org\/#organization","name":"Fiji Roads Authority","url":"https:\/\/www.fijiroads.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","width":600,"height":100,"caption":"Fiji Roads Authority"},"image":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/f97a59d3188256f89bc4cb59eac9fcb6","name":"Zafiya Shamim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","caption":"Zafiya Shamim"},"url":"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-29 12:01:18","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/3127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=3127"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/3127\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/8244"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=3127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=3127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=3127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}