{"id":2935,"date":"2017-11-02T00:52:12","date_gmt":"2017-11-02T00:52:12","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=2935"},"modified":"2017-11-02T00:52:12","modified_gmt":"2017-11-02T00:52:12","slug":"traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/","title":{"rendered":"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION"},"content":{"rendered":"<p>2 November 2017<\/p>\n<p>Fiji Roads Authority (FRA) would like to advise members of the public that the Vatuwaqa Bailey Bridge traffic signal is presently not operational. <\/p>\n<p>Traffic Engineer Musheer Khan says that FRA Traffic Signal Technicians had been working around the clock and have been able to identify the cause of the failure. <\/p>\n<p>\u201cThe FRA is trying its best to fully restore it as quickly as possible, however, they will need to replace the faulty components which need to be sourced from overseas therefore an inherent delay is expected.\u201d<\/p>\n<p>Mr Khan said the FRA was also looking at air freighting portable traffic signals to ease the situation in any further failures in future.<\/p>\n<p>\u201cOur contractor Fulton Hogan Hiways is managing traffic along the Vatuwaqa Bridge from 4:00am to 9:00pm daily to minimise any traffic congestion and provide a safe passage for all motorists.\u201d<\/p>\n<p>In the interim, Mr Khan has advised motorists to follow the directions of the traffic controllers to ensure the safety of other motorists and workmen alike. <\/p>\n<p>Travelers along this area are advised to take this notice into account when finalising travel plans. We apologise for the expected inconvenience. For further queries please call the FRA on 5720.<\/p>\n<p><strong>Read Full Report Here: <a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/11\/TRAFFIC-LIGHTS-AT-VATUWAQA-BAILEY-BRIDGE-TEMPORARILY-OUT-OF-COMMISSION-1.pdf\">TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>2 November 2017 Fiji Roads Authority (FRA) would like to advise members of the public that the Vatuwaqa Bailey Bridge traffic signal is presently not operational.<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":6804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-2935","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"2 November 2017 Fiji Roads Authority (FRA) would like to advise members of the public that the Vatuwaqa Bailey Bridge traffic signal is presently not operational. [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-02T00:52:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"646\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zafiya Shamim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zafiya Shamim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/\"},\"author\":{\"name\":\"Zafiya Shamim\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/5349174c7c2be38059bdf4f4dd745184\"},\"headline\":\"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION\",\"datePublished\":\"2017-11-02T00:52:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/\"},\"wordCount\":221,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"articleSection\":[\"Media Release\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/\",\"name\":\"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"datePublished\":\"2017-11-02T00:52:12+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/5349174c7c2be38059bdf4f4dd745184\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"width\":1080,\"height\":646},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/11\\\/02\\\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/5349174c7c2be38059bdf4f4dd745184\",\"name\":\"Zafiya Shamim\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"caption\":\"Zafiya Shamim\"},\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/zafiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/","og_locale":"en_US","og_type":"article","og_title":"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION - Fiji Roads Authority","og_description":"2 November 2017 Fiji Roads Authority (FRA) would like to advise members of the public that the Vatuwaqa Bailey Bridge traffic signal is presently not operational. [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/","og_site_name":"Fiji Roads Authority","article_published_time":"2017-11-02T00:52:12+00:00","og_image":[{"width":1080,"height":646,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","type":"image\/jpeg"}],"author":"Zafiya Shamim","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Zafiya Shamim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/"},"author":{"name":"Zafiya Shamim","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/5349174c7c2be38059bdf4f4dd745184"},"headline":"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION","datePublished":"2017-11-02T00:52:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/"},"wordCount":221,"commentCount":0,"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","articleSection":["Media Release"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/","url":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/","name":"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","datePublished":"2017-11-02T00:52:12+00:00","author":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/5349174c7c2be38059bdf4f4dd745184"},"breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","width":1080,"height":646},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/11\/02\/traffic-lights-vatuwaqa-bailey-bridge-temporarily-commission\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"TRAFFIC LIGHTS AT VATUWAQA BAILEY BRIDGE TEMPORARILY OUT OF COMMISSION"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/5349174c7c2be38059bdf4f4dd745184","name":"Zafiya Shamim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","caption":"Zafiya Shamim"},"url":"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-08-22 09:52:59","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/2935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=2935"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/2935\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/6804"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=2935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=2935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=2935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}