{"id":2709,"date":"2017-10-12T00:46:54","date_gmt":"2017-10-12T00:46:54","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=2709"},"modified":"2017-10-12T00:46:54","modified_gmt":"2017-10-12T00:46:54","slug":"major-road-repair-works-underway-princes-road","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/","title":{"rendered":"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD"},"content":{"rendered":"<p>12 October 2017<\/p>\n<p>Fiji Roads Authority (FRA) is carrying out major pavement repair works at Princes Road (from Lakeba Street to past Khalsa Road junction) as part of its Accelerated Structural Repairs (ASR) programme.<\/p>\n<p>General Manager Network Operations and Maintenance Aram Goes says these sections of roads have badly failed pavements which require extensive full-width repairs as a method of treatment.<\/p>\n<p>\u201cThese works are carried out under the ASR programme which will mitigate the current road conditions experienced on Princes Road,\u201d Mr Goes said.<\/p>\n<p>\u201cOver the coming year major works planned on the Arterial Network through the Suva-Nausori corridor will affect traffic congestion. The FRA aims to ensure the alternative access via Princes Road is therefore in better condition to accommodate the anticipated increase in vehicle use.\u201d<\/p>\n<p>He said the FRA was managing its compromised Arterial Network in 2017 and implementing a remedial strategy to improve the level of service of the roads identified with high reoccurring maintenance demands.<\/p>\n<p>\u201cThese roads are mostly on a higher Hierarchy \u2013 Arterial and Urban Collectors with very high level of traffic and heavy vehicles.\u201d<\/p>\n<p>Mr Goes said the road will remain open with single lane Traffic Management Plans in place from time-to-time, outside peak hours.<\/p>\n<p>\u201cAlthough these works do not restrict accessibility, motorists are requested to factor in extra travel time in their journey, adhere to the speed limits and observe all road signs\u201d.<\/p>\n<p>Once work is completed before December, Mr Goes said the improved roads will provide a smoother and safer journey to the motorists, with more visible signage and road markings.<\/p>\n<p>\u201cThe FRA wishes to thank members of the public for their patience and cooperation during these important works.\u201d<\/p>\n<p><strong>Read Full Report: <\/strong><a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/MAJOR-ROAD-REPAIR-WORKS-UNDERWAY-AT-PRINCES-ROAD.pdf\"><strong>MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>12 October 2017 Fiji Roads Authority (FRA) is carrying out major pavement repair works at Princes Road (from Lakeba Street to past Khalsa Road junction) as<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":2711,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-2709","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"12 October 2017 Fiji Roads Authority (FRA) is carrying out major pavement repair works at Princes Road (from Lakeba Street to past Khalsa Road junction) as [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2017-10-12T00:46:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Zafiya Shamim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Zafiya Shamim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/\",\"url\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/\",\"name\":\"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\/\/www.fijiroads.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg\",\"datePublished\":\"2017-10-12T00:46:54+00:00\",\"author\":{\"@id\":\"https:\/\/www.fijiroads.org\/#\/schema\/person\/34c2a62ee697a359ff0864129848ae97\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#primaryimage\",\"url\":\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg\",\"contentUrl\":\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.fijiroads.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.fijiroads.org\/#website\",\"url\":\"https:\/\/www.fijiroads.org\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.fijiroads.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.fijiroads.org\/#\/schema\/person\/34c2a62ee697a359ff0864129848ae97\",\"name\":\"Zafiya Shamim\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.fijiroads.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g\",\"caption\":\"Zafiya Shamim\"},\"url\":\"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/","og_locale":"en_US","og_type":"article","og_title":"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD - Fiji Roads Authority","og_description":"12 October 2017 Fiji Roads Authority (FRA) is carrying out major pavement repair works at Princes Road (from Lakeba Street to past Khalsa Road junction) as [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/","og_site_name":"Fiji Roads Authority","article_published_time":"2017-10-12T00:46:54+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg","type":"image\/jpeg"}],"author":"Zafiya Shamim","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Zafiya Shamim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/","url":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/","name":"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg","datePublished":"2017-10-12T00:46:54+00:00","author":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/34c2a62ee697a359ff0864129848ae97"},"breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/10\/FRA-is-carrying-out-major-pavement-repair-works-at-Princes-Road-from-Lakeba-Street-to-past-Khalsa-Road-junction-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/10\/12\/major-road-repair-works-underway-princes-road\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"MAJOR ROAD REPAIR WORKS UNDERWAY AT PRINCES ROAD"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/34c2a62ee697a359ff0864129848ae97","name":"Zafiya Shamim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0872e45fc11b656e6a64e247fc43b6f3ea41e830d08e7c5f7f11671b1a520923?s=96&d=mm&r=g","caption":"Zafiya Shamim"},"url":"https:\/\/www.fijiroads.org\/index.php\/author\/zafiya\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-05-13 08:40:30","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/2709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=2709"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/2709\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/2711"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=2709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=2709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=2709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}