{"id":1893,"date":"2017-04-23T03:23:08","date_gmt":"2017-04-23T03:23:08","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=1893"},"modified":"2017-04-23T03:23:08","modified_gmt":"2017-04-23T03:23:08","slug":"road-surface-improvement-work-waimanu-road-commence-tonight","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/","title":{"rendered":"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT"},"content":{"rendered":"<p>MEDIA RELEASE<br \/>\n23 April 2017<\/p>\n<p>Road works will commence on Sunday night (23 April) to improve the road surface on Waimanu Road. This is ahead of the major Suva Arterial Road Upgrading Project 2 (SARUP 2) that will take place next year.<br \/>\nFiji Roads Authority (FRA) Chief Executive Officer John Hutchinson says that the work taking place now will involve removing the badly deteriorated seal and applying a fresh coat of asphalt.<br \/>\nMr Hutchinson says that this will also involve an element of getting some much needed road shape in order to positively manage the road surface drainage on Waimanu Road.<br \/>\n\u201cOn this mini project, the FRA is also working with the Water Authority of Fiji (WAF) to install 3 new road (dead) laterals at a suitable depth in preparation for the WAF future work in Waimanu Road.\u201d<br \/>\n\u201cOur contractors will be working night shifts and the work will involve removing the top sealed layer of the heavily deteriorated sections on Waimanu Road and replacing it with a fresh layer of asphalt.\u201d<br \/>\nMr Hutchinson says that during this period, the general public is advised to observe all temporary traffic controls and strictly abide by the safety measures that will be in place. However he also reiterates that the work will take place at night however motorists are reminded to slow down through the area at all times day and night.<br \/>\n\u201cWeather permitting and if the program proceeds as planned this work should be completed by the end of May.\u201d<br \/>\n\u201cThis work is carried out under the \u201cAccelerated Structures Repair (ASR) Program and will mitigate the current road conditions experienced on Waimanu Road and this will be further improved when the SARUP 2 project comes to the City in 2018.\u201d<br \/>\nMr Hutchinson says that the Accelerated Structural Repair (ASR) program is about FRA managing its compromised Arterial Network in 2017 and implementing a (albeit temporary) remedial strategy to improve the level of service of identified roads or sections of roads. These roads are mostly on a higher Hierarchy \u2013 Arterial and Urban Collectors with very high vehicle (and heavy vehicles). These sections of roads have badly failed pavements and requires full rehabilitations as a method of treatment.<br \/>\nHe adds that current and completed projects under this program include:<br \/>\n\u2022 Kings Rd @ Wainibuku Bridge (part of SARUP 2 package) \u2013 approaches to Wainibuku Bridge including the Wainibuku Bridge deck. This work is completed.<br \/>\n\u2022 Princes Rd (Section 1 which is part of SARUP 2 package)\u2013 from Waila to Duilomaloma Bridge (sections). This work is in progress<br \/>\nThere are 8 roads in total that will receive this treatment including sections of Waimanu Road and the two roads mentioned above.<br \/>\nAs a result drivers can expect a better level of service when driving on Waimanu Road<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MEDIA RELEASE 23 April 2017 Road works will commence on Sunday night (23 April) to improve the road surface on Waimanu Road. This is ahead of<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":6804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,2],"tags":[],"class_list":["post-1893","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"MEDIA RELEASE 23 April 2017 Road works will commence on Sunday night (23 April) to improve the road surface on Waimanu Road. This is ahead of [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-23T03:23:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"646\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/3a5153cb6a95456ab495bb87d2ffea9c\"},\"headline\":\"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT\",\"datePublished\":\"2017-04-23T03:23:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/\"},\"wordCount\":455,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"articleSection\":[\"Media Release\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/\",\"name\":\"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"datePublished\":\"2017-04-23T03:23:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"width\":1080,\"height\":646},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/04\\\/23\\\/road-surface-improvement-work-waimanu-road-commence-tonight\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\",\"name\":\"Fiji Roads Authority\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"width\":600,\"height\":100,\"caption\":\"Fiji Roads Authority\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/3a5153cb6a95456ab495bb87d2ffea9c\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.fijiroads.org\\\/\"],\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/webmedia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/","og_locale":"en_US","og_type":"article","og_title":"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT - Fiji Roads Authority","og_description":"MEDIA RELEASE 23 April 2017 Road works will commence on Sunday night (23 April) to improve the road surface on Waimanu Road. This is ahead of [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/","og_site_name":"Fiji Roads Authority","article_published_time":"2017-04-23T03:23:08+00:00","og_image":[{"width":1080,"height":646,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/"},"author":{"name":"admin","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/3a5153cb6a95456ab495bb87d2ffea9c"},"headline":"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT","datePublished":"2017-04-23T03:23:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/"},"wordCount":455,"commentCount":0,"publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","articleSection":["Media Release","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/","url":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/","name":"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","datePublished":"2017-04-23T03:23:08+00:00","breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","width":1080,"height":646},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/04\/23\/road-surface-improvement-work-waimanu-road-commence-tonight\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"ROAD SURFACE IMPROVEMENT WORK FOR WAIMANU ROAD TO COMMENCE TONIGHT"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.fijiroads.org\/#organization","name":"Fiji Roads Authority","url":"https:\/\/www.fijiroads.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","width":600,"height":100,"caption":"Fiji Roads Authority"},"image":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/3a5153cb6a95456ab495bb87d2ffea9c","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.fijiroads.org\/"],"url":"https:\/\/www.fijiroads.org\/index.php\/author\/webmedia\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-11-10 21:45:24","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/1893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=1893"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/1893\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/6804"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=1893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=1893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=1893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}