{"id":1438,"date":"2017-01-30T00:03:52","date_gmt":"2017-01-30T00:03:52","guid":{"rendered":"http:\/\/www.fijiroads.org\/?p=1438"},"modified":"2017-01-30T00:03:52","modified_gmt":"2017-01-30T00:03:52","slug":"kaudamu-junction-road-opening-deferred-to-next-month","status":"publish","type":"post","link":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/","title":{"rendered":"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH"},"content":{"rendered":"<p><strong>30 January 2017<\/strong><\/p>\n<p>Kinoya Road at the Kaudamu junction will now reopen to motorists by the end of February, subject to weather and motorists are advised to use Vesivesi Road as an alternative route in the interim.<\/p>\n<p>This was after the discovery of soil washout beneath the road.<\/p>\n<p>Fiji Roads Authority (FRA) Chief Executive Officer John Hutchinson says they have completed the site assessments together with the designs and the contractors will mobilize to site as early as tomorrow.<\/p>\n<p>\u201cThe road was initially scheduled to reopen on 28 January however, there has been a delay due to the underground water and other utility services that requires careful control of the earthworks and reinstatement.\u201d<\/p>\n<p>In an earlier statement, Aram Goes FRA General Manager Network Operations and Maintenance said that this is a difficult repair to carry out due to the continuous flow of water through the culvert that is required for upstream property drainage.<\/p>\n<p>\u201cA 900mm diameter stormwater culvert pipe runs beneath the road and it appears the pipes may have separated at a join resulting in the washout of soil between the culvert and the road.\u201d<\/p>\n<p>Mr Goes said the distance between the culvert and the road is about 2.5 meters and the soil washout has compromised the structural make-up of the road resulting in the closure.<\/p>\n<p><a href=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/MEDIA-RELEASE-KINOYA-KAUDAMU-JUNCTION-ROAD-1-1.pdf\">MEDIA RELEASE-KINOYA -KAUDAMU JUNCTION ROAD<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1440\" src=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2-300x225.jpg\" alt=\"Kinoya Road 2\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2-300x225.jpg 300w, https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2-1024x768.jpg 1024w, https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2-768x576.jpg 768w, https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2-100x75.jpg 100w, https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2-480x360.jpg 480w, https:\/\/www.fijiroads.org\/wp-content\/uploads\/2017\/01\/Kinoya-Road-2.jpg 1040w\" sizes=\"auto, (max-width:767px) 300px, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>30 January 2017 Kinoya Road at the Kaudamu junction will now reopen to motorists by the end of February, subject to weather and motorists are advised<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":6804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH - Fiji Roads Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH - Fiji Roads Authority\" \/>\n<meta property=\"og:description\" content=\"30 January 2017 Kinoya Road at the Kaudamu junction will now reopen to motorists by the end of February, subject to weather and motorists are advised [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/\" \/>\n<meta property=\"og:site_name\" content=\"Fiji Roads Authority\" \/>\n<meta property=\"article:published_time\" content=\"2017-01-30T00:03:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"646\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/feeed92333f846cbff4ea131d97d9f23\"},\"headline\":\"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH\",\"datePublished\":\"2017-01-30T00:03:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/\"},\"wordCount\":227,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"articleSection\":[\"Media Release\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/\",\"name\":\"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH - Fiji Roads Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"datePublished\":\"2017-01-30T00:03:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/tiker-1-1-e1713324213440.jpg\",\"width\":1080,\"height\":646},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/2017\\\/01\\\/30\\\/kaudamu-junction-road-opening-deferred-to-next-month\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fijiroads.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#website\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"name\":\"Fiji Roads Authority\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fijiroads.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#organization\",\"name\":\"Fiji Roads Authority\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.fijiroads.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/FRA-Logo-1.png\",\"width\":600,\"height\":100,\"caption\":\"Fiji Roads Authority\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fijiroads.org\\\/#\\\/schema\\\/person\\\/feeed92333f846cbff4ea131d97d9f23\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.fijiroads.org\\\/\"],\"url\":\"https:\\\/\\\/www.fijiroads.org\\\/index.php\\\/author\\\/webmedia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH - Fiji Roads Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/","og_locale":"en_US","og_type":"article","og_title":"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH - Fiji Roads Authority","og_description":"30 January 2017 Kinoya Road at the Kaudamu junction will now reopen to motorists by the end of February, subject to weather and motorists are advised [\u2026]","og_url":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/","og_site_name":"Fiji Roads Authority","article_published_time":"2017-01-30T00:03:52+00:00","og_image":[{"width":1080,"height":646,"url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#article","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/"},"author":{"name":"admin","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/feeed92333f846cbff4ea131d97d9f23"},"headline":"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH","datePublished":"2017-01-30T00:03:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/"},"wordCount":227,"commentCount":0,"publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","articleSection":["Media Release"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/","url":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/","name":"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH - Fiji Roads Authority","isPartOf":{"@id":"https:\/\/www.fijiroads.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#primaryimage"},"image":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#primaryimage"},"thumbnailUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","datePublished":"2017-01-30T00:03:52+00:00","breadcrumb":{"@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#primaryimage","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2024\/04\/tiker-1-1-e1713324213440.jpg","width":1080,"height":646},{"@type":"BreadcrumbList","@id":"https:\/\/www.fijiroads.org\/index.php\/2017\/01\/30\/kaudamu-junction-road-opening-deferred-to-next-month\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fijiroads.org\/"},{"@type":"ListItem","position":2,"name":"KAUDAMU JUNCTION ROAD OPENING DEFERRED TO NEXT MONTH"}]},{"@type":"WebSite","@id":"https:\/\/www.fijiroads.org\/#website","url":"https:\/\/www.fijiroads.org\/","name":"Fiji Roads Authority","description":"","publisher":{"@id":"https:\/\/www.fijiroads.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fijiroads.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.fijiroads.org\/#organization","name":"Fiji Roads Authority","url":"https:\/\/www.fijiroads.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","contentUrl":"https:\/\/www.fijiroads.org\/wp-content\/uploads\/2026\/09\/FRA-Logo-1.png","width":600,"height":100,"caption":"Fiji Roads Authority"},"image":{"@id":"https:\/\/www.fijiroads.org\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.fijiroads.org\/#\/schema\/person\/feeed92333f846cbff4ea131d97d9f23","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6223269786c8eba08e0aca986905badaff21385c6ca3069f9473e28b806706d7?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.fijiroads.org\/"],"url":"https:\/\/www.fijiroads.org\/index.php\/author\/webmedia\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-11-12 23:21:52","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/1438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/comments?post=1438"}],"version-history":[{"count":0,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/posts\/1438\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media\/6804"}],"wp:attachment":[{"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/media?parent=1438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/categories?post=1438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fijiroads.org\/index.php\/wp-json\/wp\/v2\/tags?post=1438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}